ME HotelM&E AI
Home › Standards › GB 50217-2018 › 第5.7.3条

GB 50217-2018 第5.7.3条 Standard for Design of Cables in Power Engineering

Cable laying电气工程

GB 50217-2018 第5.7.3条

| Where cables penetrate floor slabs, firewalls and partition walls, they shall be tightly sealed with firestop materials. Where cables in the hotel penetrate partition walls between guest rooms and corridors, and floor slabs between equipment floors and guest room floors, the sealing must achieve the same fire resistance rating as the building element (e.g., 1.5 h or 2.0 h).

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.