ME HotelM&E AI
Home › Standards › GB 50217-2018 › 第5.4.1条

GB 50217-2018 第5.4.1条 Standard for Design of Cables in Power Engineering

Cable laying电气工程

GB 50217-2018 第5.4.1条

| When cables are laid in cable trenches or cable wells, waterproofing and drainage measures shall be taken. Cable trenches in the hotel basement or equipment floor shall be provided with sumps and drainage pumps to prevent standing water from soaking the cables.

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.