GB 50311-2016 第7.5.1条
| **** | When cables are laid in cable trays or trunking, the fill ratio shall not exceed 40%; when laid in conduits, the conduit utilization ratio shall not exceed 50%. |
| **** | When cables are laid in cable trays or trunking, the fill ratio shall not exceed 40%; when laid in conduits, the conduit utilization ratio shall not exceed 50%. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.