GB 50311-2016 第4.5.2条
| **** | The equipment room (BD) should be located on the hotel's first floor or basement level 1, with an area of no less than 10㎡, and should be kept away from strong electromagnetic interference sources and water sources. |
| **** | The equipment room (BD) should be located on the hotel's first floor or basement level 1, with an area of no less than 10㎡, and should be kept away from strong electromagnetic interference sources and water sources. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.