GB 50242-2002 第11.4.3条
| **** | During commissioning of the hot water supply system, the water temperature at each distribution point of the system shall be checked and measured to ensure compliance with the design requirements. |
| **** | During commissioning of the hot water supply system, the water temperature at each distribution point of the system shall be checked and measured to ensure compliance with the design requirements. |