GB 50242-2002 第11.3.3条
| **** | During commissioning of the heating system, the indoor temperature of each loop and room in the system shall be checked and measured to meet the design requirements. |
| **** | During commissioning of the heating system, the indoor temperature of each loop and room in the system shall be checked and measured to meet the design requirements. |