GB 50242-2002 第11.3.2条
| **** | After flushing is completed, the heating system shall be filled with water, heated, and subjected to trial operation and commissioning. |
| **** | After flushing is completed, the heating system shall be filled with water, heated, and subjected to trial operation and commissioning. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.