GB 50242-2002 第11.3.1条
| **** | After the indoor heating system installation is completed, a hydrostatic test shall be conducted before pipe insulation. The test pressure shall comply with the design requirements. |
| **** | After the indoor heating system installation is completed, a hydrostatic test shall be conducted before pipe insulation. The test pressure shall comply with the design requirements. |