GB 50242-2002 第11.2.1条
| **** | Before the indoor water supply system (including the domestic hot water system) is put into use, a water flow test must be conducted and recorded. |
| **** | Before the indoor water supply system (including the domestic hot water system) is put into use, a water flow test must be conducted and recorded. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.