ME HotelM&E AI
Home › Standards › GB 50242-2002 › 第11.3.3条

GB 50242-2002 第11.3.3条 Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering

Indoor heating给排水

GB 50242-2002 第11.3.3条

| **** | System flushing: After the system passes the pressure test, the system shall be flushed and the strainers and dirt separators shall be cleaned. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.