GB 50242-2002 第7.3.3条
| **** | **The main drainage stacks and horizontal main pipes shall all undergo a ball-passing test; the ball diameter shall be no less than 2/3 of the drainage pipe diameter, and the ball-passing rate must reach 100%.** (A key acceptance item for concealed works of the hotel drainage system, to prevent blockages left over from construction) |