GB 50242-2002 第7.2.2条
| **** | **Before handover, sanitary fixtures shall undergo full-water and flow tests.** (Ensure all hotel sanitary fixtures are leak-free and drain properly after installation) |
| **** | **Before handover, sanitary fixtures shall undergo full-water and flow tests.** (Ensure all hotel sanitary fixtures are leak-free and drain properly after installation) |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.