GB 50242-2002 第6.2.6条
| **** | **Valves in the hot water supply system shall undergo strength and tightness tests before installation.** For each batch (same brand, same model, same specification), 10% shall be sampled for testing, with no fewer than one. For closed-circuit valves installed on main pipes to serve as shutoff valves, strength and tightness tests shall be conducted individually. |