ME HotelM&E AI
Home › Standards › GB 50242-2002 › 第6.2.3条

GB 50242-2002 第6.2.3条 Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering

Indoor hot water给排水

GB 50242-2002 第6.2.3条

| **** | **After the hot water supply system is completed, flushing must be carried out.** Flushing shall use clean water at the system's maximum design flow rate or at a velocity of not less than 1.5 m/s, until the water quality at the outlet is consistent with that at the inlet. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.