GB 50242-2002 第12.2.3条 Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering

Indoor drainage给排水

GB 50242-2002 第12.2.3条

| **** | Before handover, sanitary fixtures shall undergo full-water and flow tests. After filling with water, all connections shall be free of leakage and seepage; in the flow test, water supply and drainage shall be unobstructed. |