GB 50242-2002 第3.2.11条
| | After the heating system installation is completed, a hydrostatic test shall be carried out, and flushing and commissioning shall be performed in accordance with the design requirements. |
| | After the heating system installation is completed, a hydrostatic test shall be carried out, and flushing and commissioning shall be performed in accordance with the design requirements. |