GB 50242-2002 第3.2.8条
| | The indoor drainage system shall be provided with vent pipes in accordance with the design requirements, and a ball-through test shall be conducted. |
| | The indoor drainage system shall be provided with vent pipes in accordance with the design requirements, and a ball-through test shall be conducted. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.