GB 50242-2002 第3.2.6条
| | After the piping system installation is completed, hydrostatic tests, water-filling tests and water-flow tests shall be carried out in accordance with the design requirements. |
| | After the piping system installation is completed, hydrostatic tests, water-filling tests and water-flow tests shall be carried out in accordance with the design requirements. |