GB 50242-2002 第3.2.1条
| | Before valve installation, strength and tightness tests shall be conducted; for each batch (same brand, same model, same specification), 10% shall be sampled for testing, with not less than one valve. |
| | Before valve installation, strength and tightness tests shall be conducted; for each batch (same brand, same model, same specification), 10% shall be sampled for testing, with not less than one valve. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.