GB 50015-2019 第4.9.1条
| Drainage pipe inspection opening spacing: one on each vertical stack every 6 floors (mandatory at the bottom and top floors), and one every 10 m on horizontal pipes; in hotel buildings, inspection openings on guest room floor drainage stacks should be located in accessible positions within pipe shafts.