GB 50974-2014 第13.1.12条
| **** | Pump adapter commissioning: a water-filling test shall be conducted to ensure the interface connected to the fire truck can supply water normally; the quantity shall be calculated based on the system design flow rate (hotels typically require no fewer than 2). |