GB 50974-2014 第13.1.4条
| **** | Fire pump commissioning: when started automatically or manually, it should be put into normal operation within 55s; when the standby power supply is switched, the pump should complete startup within 1min. |
| **** | Fire pump commissioning: when started automatically or manually, it should be put into normal operation within 55s; when the standby power supply is switched, the pump should complete startup within 1min. |