GB 50974-2014 第12.3.9条
| **** | Pressure testing and flushing of the fire water supply system shall meet the design requirements. After pipeline installation in the hotel building, strength testing (1.5 times the working pressure) and tightness testing (working pressure) must be carried out; the test pressure and pressure-holding time shall meet the code requirements, and records shall be kept. |