GB 50974-2014 第8.3.1条
| **** | Fire water supply pipes shall undergo a hydrostatic test at 1.5 times the working pressure and not less than 0.60 MPa; the pressure test must be completed and recorded before concealment in hotel buildings. |
| **** | Fire water supply pipes shall undergo a hydrostatic test at 1.5 times the working pressure and not less than 0.60 MPa; the pressure test must be completed and recorded before concealment in hotel buildings. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.