ME HotelM&E AI
Home › Standards › GB 50084-2017 › 第8.0.2条

GB 50084-2017 第8.0.2条 Code for Design of Sprinkler Systems

Pipe消防工程

GB 50084-2017 第8.0.2条

| **** | Water distribution pipes shall be hot-dip galvanized steel pipes with internal and external walls, coated steel pipes, copper pipes, or stainless steel pipes, and ordinary welded steel pipes shall not be used. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.