GB 51251-2017 第9.0.3条
| **** | Before acceptance, check whether construction quality, commissioning reports, as-built drawings and other documentation are complete. For hotel projects, focus on verifying that smoke control zone partitioning, smoke exhaust outlet locations, etc. are consistent with the design. |