GB 51251-2017 第9.0.2条
| **** | Acceptance shall be organized by the construction unit, with the design, construction, supervision and other units participating, and on-site sampling inspection and functional testing shall be carried out. |
| **** | Acceptance shall be organized by the construction unit, with the design, construction, supervision and other units participating, and on-site sampling inspection and functional testing shall be carried out. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.