GB 51251-2017 第9.0.1条
| **** | After system completion, project acceptance inspection shall be conducted; if the inspection fails, the system shall not be put into use. As a public building, the hotel must pass this acceptance inspection. |
| **** | After system completion, project acceptance inspection shall be conducted; if the inspection fails, the system shall not be put into use. As a public building, the hotel must pass this acceptance inspection. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.