GB 51251-2017 第9.4.2条
| **** | During integrated commissioning, fire signals should be simulated to test the actuation logic of the smoke control system (stairwell and vestibule supply air outlets and fan interlock) and the smoke exhaust system (smoke exhaust outlets, smoke exhaust valves, smoke exhaust fans, and make-up air fans interlock). For hotels, particular emphasis should be placed on testing the interlock relationship between corridor smoke exhaust and stairwell pressurization air supply. |