ME HotelM&E AI
Home › Standards › GB 51251-2017 › 第5.1.2条

GB 51251-2017 第5.1.2条 Technical Standard for Smoke Control and Exhaust Systems in Buildings

System control消防工程

GB 51251-2017 第5.1.2条

| **** | **Linkage control requirements**: After the fire alarm is triggered, the smoke control system (pressurization air supply) shall, through the fire linkage controller, open the normally closed supply air outlets in the antechambers and shared antechambers on the fire floor and the adjacent floors above and below, and simultaneously start the corresponding pressurization supply fans. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.