GB 50264-2013 第6.3.2条
| | The vapor barrier should be installed after the insulation layer is dry, and should be complete and sealed, without bubbles, wrinkles, or cracks. |
| | The vapor barrier should be installed after the insulation layer is dry, and should be complete and sealed, without bubbles, wrinkles, or cracks. |