ME HotelM&E AI
Home › Standards › GB 50264-2013 › 第6.3.2条

GB 50264-2013 第6.3.2条 Code for Design of Thermal Insulation Engineering of Industrial Equipment and Pipelines

Construction requirements暖通空调

GB 50264-2013 第6.3.2条

| | The vapor barrier should be installed after the insulation layer is dry, and should be complete and sealed, without bubbles, wrinkles, or cracks. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.