ME HotelM&E AI
Home › Standards › GB 50264-2013 › 第6.1.1条

GB 50264-2013 第6.1.1条 Code for Design of Thermal Insulation Engineering of Industrial Equipment and Pipes

Construction requirements暖通空调

GB 50264-2013 第6.1.1条

| | Before insulation works commence, design disclosure, material inspection and preparation of the construction plan shall be completed to ensure construction conditions meet the design requirements. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.