GB 50264-2013 第6.1.1条
| | Before insulation works commence, design disclosure, material inspection and preparation of the construction plan shall be completed to ensure construction conditions meet the design requirements. |
| | Before insulation works commence, design disclosure, material inspection and preparation of the construction plan shall be completed to ensure construction conditions meet the design requirements. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.