GB 50041-2020 第11.4.1条 Boiler Room Design Standard

Water treatment暖通空调

GB 50041-2020 第11.4.1条

| **** | The boiler blowdown system should be equipped with continuous blowdown and intermittent blowdown devices, and blowdown heat should be recovered (e.g., by installing a blowdown expansion vessel or heat exchanger) to save energy and reduce thermal pollution. |