ME HotelM&E AI
Home › Standards › GB 50041-2020 › 第6.5.2条

GB 50041-2020 第6.5.2条 Boiler Room Design Standard

Heating system暖通空调

GB 50041-2020 第6.5.2条

| **** | The heating system should be equipped with necessary metering devices (such as heat meters and steam flow meters) to facilitate energy consumption accounting and cost management for the hotel. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.