GB 50365-2019 第6.2.8条 Standard for Operation and Management of Air-Conditioning and Ventilation Systems

Energy-efficient operation暖通空调

GB 50365-2019 第6.2.8条

| **** | **Equipment start/stop optimization**: Cooling towers, chillers, pumps and other equipment should be controlled according to actual load demand through unit-number control or variable-frequency regulation, avoiding inefficient operation of multiple units under low load. |