ME HotelM&E AI
Home › Standards › GB 50243-2016 › 第11.0.7条

GB 50243-2016 第11.0.7条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

Completion acceptance暖通空调

GB 50243-2016 第11.0.7条

| **** | Completion acceptance shall be qualified, and acceptance documents shall be produced. For hotels, particular confirmation should be made of:<br>1. Guest room fresh air volume, exhaust air volume and noise meet standards;<br>2. Kitchen exhaust fume system air volume, purification efficiency and make-up air system are normal;<br>3. Air-conditioning temperature and humidity and air distribution in public areas (lobby, meeting rooms) meet comfort requirements;<br>4. Smoke control and exhaust system linkage functions are normal (involving fire acceptance). |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.