GB 50243-2016 第11.0.5条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

Completion acceptance暖通空调

GB 50243-2016 第11.0.5条

| **** | Upon completion acceptance of ventilation and air-conditioning works, system energy-efficiency performance testing shall be carried out. As a public building, the hotel's air-conditioning system shall meet the requirements of the Standard for Acceptance of Energy Efficient Building Construction GB 50411 with respect to the energy efficiency ratio of the cooling/heating source, transmission and distribution system and terminal equipment, the return water temperature of the water system, and the air volume of the air system. |