GB 50243-2016 第11.0.2条
| **** | Before the completion acceptance of ventilation and air-conditioning works, the combined trial operation and commissioning of the systems shall be completed. Parameters such as air volume, temperature, humidity and noise in areas including hotel guest rooms, banquet halls and kitchens must meet the design and code requirements. |