ME HotelM&E AI
Home › Standards › GB 50243-2016 › 第11.2.3条

GB 50243-2016 第11.2.3条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

System commissioning暖通空调

GB 50243-2016 第11.2.3条

| **** | For terminal equipment such as fan coil units and fresh air handling units, the individual trial run shall be conducted, and the motor current, temperature rise and noise shall meet the design requirements. Fan coil units in hotel guest rooms shall meet the quiet operation requirements at low fan speed. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.