GB 50243-2016 第11.2.1条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

System commissioning暖通空调

GB 50243-2016 第11.2.1条

| **** | Before system commissioning, confirm that individual equipment trial runs have passed and that ductwork, water pipes, and other piping systems have been cleaned. For hotel guest room fresh air systems, lobby air-conditioning systems, etc., ensure there is no construction debris. |