GB 50243-2016 第10.2.1条
2. In hotel buildings, **anti-condensation** (Clauses 10.2.4 and 10.2.8) and **fire protection** (Clause 10.1.2) are the core control points of insulation engineering and require priority inspection.
2. In hotel buildings, **anti-condensation** (Clauses 10.2.4 and 10.2.8) and **fire protection** (Clause 10.1.2) are the core control points of insulation engineering and require priority inspection.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.