ME HotelM&E AI
Home › Standards › GB 50243-2016 › 第9.3.2条

GB 50243-2016 第9.3.2条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

Air-conditioning water system暖通空调

GB 50243-2016 第9.3.2条

| **** | **Flushing and Water Quality**: After the system passes the pressure test, the system shall be flushed until the water at the outlet is clear. After flushing, water quality testing shall be conducted to ensure the water quality meets the design requirements (such as pH value, hardness, total bacterial count, etc.), preventing blockage or corrosion of hotel terminal equipment. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.