GB 50243-2016 第9.2.5条
| **** | **Valve installation**: Valves shall undergo strength and tightness tests before installation. Valves installed on main pipes (e.g., in the hotel's air-conditioning plant room) must be tested individually; other valves (e.g., branch pipe valves of guest room fan coil units) may be subject to sampling inspection on a proportional basis. |