GB 50243-2016 第8.1.3条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

Air-conditioning cooling system暖通空调

GB 50243-2016 第8.1.3条

| **** | The installation location, foundation elevation, and vibration isolation measures of refrigeration equipment (such as chillers and heat pumps) shall comply with the design requirements; the equipment foundation shall be level and solid, and the anchor bolt positions shall be correct. |