ME HotelM&E AI
Home › Standards › GB 50243-2016 › 第7.2.13条

GB 50243-2016 第7.2.13条 Code for acceptance of construction quality of ventilation and air conditioning works

Ventilation and air-conditioning equipment installation暖通空调

GB 50243-2016 第7.2.13条

| | Equipment trial run: Fans, AHUs, etc. shall run continuously for 2 h, with bearing temperature rise ≤40℃ and vibration values meeting product standards. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.