ME HotelM&E AI
Home › Standards › GB 50243-2016 › 第6.2.2条

GB 50243-2016 第6.2.2条 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

Ductwork system installation暖通空调

GB 50243-2016 第6.2.2条

| **** | Duct connections must not be installed within walls or floor slabs, and supports and hangers must not be located at air outlets, valves, access doors, or automatic control mechanisms; anti-condensation-bridge measures shall be provided between hanger rods and ducts. **(In hotel fit-out projects, the space above suspended ceilings is complex; this clause prevents difficulties in later maintenance and condensation issues.)** |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.