GB 50243-2016 第6.2.1条
| **** | Before duct installation, debris inside and outside the duct shall be removed, and cleaning and protection shall be carried out; the installation position, elevation and routing of the duct shall comply with the design requirements. **(Hotel guest rooms and public areas are sensitive to noise and cleanliness; this clause ensures baseline installation quality)** |