GB 50243-2016 第3.0.5条
| | Before concealed works are covered up, the contractor shall notify the supervision unit and other relevant parties to carry out acceptance inspection, and acceptance documents shall be produced. Concealed items in hotel ceiling voids, such as duct insulation, condensate pipe slope, and fire damper installation, must be inspected in full. |