GB 50243-2016 第3.0.4条
| | Ventilation and air-conditioning works shall be constructed in accordance with the specified procedures, and handover inspections shall be carried out between the various sub-item works. During cross-operation between hotel decoration and MEP installation, key control shall be exercised over the installation sequence of air ducts, water pipes and electrical conduits within the ceiling. |