GB 50243-2016 第2.0.45条
| **** | **Duct system air leakage test safety**: Relevant safety operating procedures shall be followed. |
| **** | **Duct system air leakage test safety**: Relevant safety operating procedures shall be followed. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.